Description
Brian Head Town requires a permit for any excavation, grading, filling, trenching, or clearing of land or vegetation (grubbing) to eliminate unsafe slopes and soil instability, to avoid detrimental alteration of drainage patterns, to provide for safe and standardized utility location and installation practices, and to preserve the natural aesthetics of a mountain town consistent with the Town’s General Plan.
If you are clearing or grading a lot in preparation for a commercial, industrial, or multi-family residential building, the grading and excavating approvals will be handled as part of the building permit process. If you are clearing or grading for a single-family residential building, you may obtain a grading and excavating permit prior to obtaining a building permit, but a restoration and landscaping bond will be required.
Required Permits & Approvals
Grading & Excavating Permit
Tree Removal Permit: Removing trees over 6” diameter
Retaining wall over 4’ high or with loading will need a building permit
Retaining Wall Approval: Over 12’ height or 100’ length (Planning Commission)
Submittal Requirements:
Permit Application
Permit Fee ($350 cabin or $600 condo/commercial)
Written Description of Activity
Security Agreement
Copy of Driver's License
Engineered Grading Plan:
Existing conditions, including:
Existing topography
Previously disturbed areas
Areas showing signs of a history of landslide or erosion
Proposed areas of disturbance
Existing and proposed surface drainage flow patterns
Location of existing and proposed utilities
Proposed cuts with slope measurements and heights
Proposed retaining walls with heights and lengths
Clearly show any tiering of walls with heights of each tier
Notes describing materials used for retaining walls
Proposed storm drainage infrastructure
Restoration and Landscaping Plan:
All disturbed, undisturbed, and landscaped areas
Areas where mature trees will be preserved
Locations of walls, walkways, patios, fences, trees, and other vegetation
Descriptions of materials used
Specification of species, variety, number and size of trees and shrubs
Description of restoration measures for remaining disturbed areas, including xeriscape and reseeding
North Arrow Indicator
Lot boundaries with dimensions and lot size
Soil/Geology Report
Geologic Conditions Form
Geotechnical Report
Insurance Information: The applicant will provide a certificate of insurance for the contractor. If work is undertaken in a Town right-of-way, the certificate must meet the following requirements:
$1,000,000 coverage
Brian Head Town named as additional insured
Review Process (Typical Approval Time - 14 days)
Completed Application Submitted
Building and Planning Review & Security Determination
Public Works Dept Review
Engineering Review
Determination Sent to Applicant
Initial Inspection (prior to commencing work)
Re-seeding Inspection (inspector must be present during reseeding)
Final Inspection
As-Built Drawings Submitted
Security Release
Standards for Review
Prevent significant erosion and soil stability issues by:
Minimizing cuts and fills on steep or hazardous terrain,
Limiting clearing of vegetation or disturbances of the soil to areas of proven stability,
Ensuring landscaping and restoration within one year of completing the grading work,
Properly retaining any potentially unsafe slopes.
Ensure that the natural/historic runoff capacity shall not be exceeded causing flooding, erosion, or silting.
Comply with Standards & Specifications for Public Works Construction and the construction requirements and standards set forth in 9-10-2(E)
Preserve the natural aesthetics of a mountain town consistent with the General Plan by:
Avoiding unnecessary clearing or burying of vegetation,
Ensuring that all excavation work, including spoil piles, do not create an attractive nuisance or hazard to the general public,
Eliminating scars from cuts and fills by rounding off sharp angles at the top, toe and sides of cut and fill slopes and matching or blending the natural contours and undulation of the land,
Preserving trees and other native vegetation where possible and in accordance with fire-safe principles,
Carefully removing, storing, and replacing a layer of fertile topsoil in disturbed areas for re-vegetation where feasible.